Ryan, and his team installed an Iron Man lift to my 1999 100 series L.C. as well as a diff. drop, new upper control arms, new lower control arm bushings, new axles and drive flanges. I was kept well informed of both pricing and the time table that it would take to finish this project. This is the second major service I have had them tackle. The first was timing belt, water pump, and heater T's. Thanks for the job that you did, I hope i'm ready for the next 100,000 miles.